Continued working on the garage redesign project. We are working on the aesthetics of the elevations and showing exterior access stairs to the proposed second story.
We continued working on the garage redesign project. We finalized the first and second floor plans, including all doors and windows. We located stairs and second floor access. We began working on raising the roof line of all of the elevations, and adding all fenestration on those views.
We changed the focus of class today to do a study of one point perspective drawing using mechanical drafting tools and the drafting board. We covered the use of the horizon line and vanishing point to establish a perspective view of a street lined with buildings. We will work on this for a few classes.
We are going to finish our AutoCAD drafting project, but I thought it might break the monotony and be interesting for Sebastian to try something different.
Hour 2: Continued working on the Garage building redesign project. We began brainstorming space layout options, stair locations, and building circulation ideas.
Continued working on the Garage building redesign project. We continued brainstorming space layout options, stair locations, and building circulation ideas.
Continued working on the Garage building redesign project. We continued brainstorming space layout options, stair locations, and building circulation ideas.